Pipefitter handbook free download
Standards Tee-Let Installation the nuts alternately and Under torquing the bolts may result in lower pressure retention capabilities, lower bend load capabilities, joint leakage and pipe joint uniformly until the bolt pads separation. Torque all bolts damage and serious injury. There is no gap between the bolt pads Coupling Bolts Minimum Maximum and the bolt torque should be In. Make sure 4 Place each half of the coupling housing over the maximum for the 2" to intended service.
The steel pipe orange for Nitrile and while holding it the pipe groove. Gruvlok Xtreme end. The gasket must Steel Pipe. The pipe Lubricant contains silicone. Gruvlok for the lubrication projections or other recommendation. Apply Make sure the gasket imperfections, which a thin coating of Gruvlok does not overhang could prevent proper Xtreme Lubricant to the into the pipe groove.
The nuts must be tightened alternately and evenly until fully tightened. Over torquing the bolts may result in damage to are in contact. Under torquing the bolts may result in lower pressure retention bolts to the required bolt capabilities, lower bend load capabilities, joint leakage and pipe joint torque levels. Refer to the separation. There is no gap between the bolt pads and the bolt torque FIG. Alternate In. Alignment Check gasket to be sure it is Slip the gasket over the pipe After aligning the two pipe compatible for the intended end, making sure the gasket ends together, pull the gasket service.
Apply a thin coat of lip does not overhang the into position, centering it Pipe and Gruvlok Lubricant to outside pipe end. For 2" - 4" keys are fully engaged in the groove.
Be sure that the tongue couplings, please use pipe grooves. For 2" - 4" and recess portions of the the table below for required ensure the gaps on each side housing mate properly. Insert torque values. It is recommended that a In. Pipe joint separation pages for groove dimensions. Housings Check gasket to be sure it is Slip the gasket half way on to Place each housing halves on compatible for the intended the pipe end, stop when the the pipe making sure the service.
Be sure that the and sealing lips of the gasket. Slide the second pipe end tongue and recess portions of Be careful that foreign half way into the gasket, the housing mate properly. Ensure pipes are aligned properly. Tighten Nuts 5. Data Installation Contents Gruvlok Gruvlok Table of 1 Pipe surface shall be cleaned at least 1" from the end of the pipe to remove 2 Check all lock bolts to be sure they do not extend into the I. Pipe and projections, and sharp edges proper insertion of the pipe.
Also apply a light coating of which could affect proper lubricant to the pipe ends to gasket sealing. As a guide for further ease insertion of the installation, mark the pipe at pipe into the Sock-It Fitting. No additional cleaning Bolt is required.
Reinstallation may be accomplished as described in Steps Tighten the lock bolt until Sock-It Fitting. Replace bolts in cases locking bolts for each pipe end. In unusual or severe The recommendations have been developed services, gasket materials should be subjected from current information supplied by to simulated service conditions to determine manufacturers of the elastomers, technical the most suitable gasket grade.
The Gruvlok information supplied should be considered as Gasket recommendations apply only to a basis for evaluation but not as a guarantee. Gruvlok gaskets. Contact an Anvil Representative for recommendations for services not listed.
For Weld Fitting and service condition. Excellent oxidation resistance. Where the gasket grade is shown in parentheses, Contact an Anvil Representative for an engineering evaluation and recommendation. Specify gasket grade when ordering. Use Gruvlok lubricant on gasket. Check gasket color code to be certain it is recommended for the service intended. For services not listed, contact an Anvil Representative for recommendation. This lubricant is waterproof, thereby eliminating water wash-out and it will not dry out in the absence of water.
It is not to be used with Silicone gaskets. The temperature change will also force the gasket to slightly re-position itself. This will cause pipe end sealing surfaces, with small cuts or damage, to become more susceptible to leakage.
Gruvlok Xtreme Lubricant will maintain its lubricating properties at lower temperatures allowing a properly lubricated pipe end and gasket assembly to reposition itself during temperature cycles. Lubrication on the inside of the gasket is easily accomplished by turning the gasket Information inside out and applying the lubricant. Gruvlok Xtreme Lubricant will maintain its lubricating properties at higher temperatures, allowing a properly lubricated pipe end and gasket assembly to re-position itself during temperature cycles.
Lubrication of the pipe end and gasket will help the gasket to adjust into the proper sealing position during temperature cycles. This is particularly important at higher temperatures where oxidizing agents in the piping system become more aggressive.
However, gasket chemical compatibility must still be considered. It is sanctioned by the FDA under C. It is NSF approved for use with potable water. The lubricant is made from a water emulsion that is non-toxic, it will not impart taste or odor, and does not support bacterial growth. It is water-soluble. The quick drying quality of the lubricant eliminates lubricant drips caused by over lubrication.
If necessary, reapply lubricant prior to assembly. Do not thin or mix with solvents. Under torquing the bolts may result in lower pressure retention capabilities, lower bend load capabilities, joint leakage and pipe joint separation.
Data Installation Contents Gruvlok Table of To create a Gruvlok pipe joint, all pipe must be prepared to receive Gruvlok coupling or other Gruvlok pipe system components. The required pipe preparation may be grooving or cleaning the pipe ends, or cutting a hole in the pipe wall. For grooved-end joints, pipe may be grooved by either of two methods; cut or roll grooving. Branch outlet connections require a properly sized and correctly located hole to be cut into the pipe.
Sock-it connections require cleaning of the pipe end. Gruvlok plain-end pipe couplings require that the pipe be free of burrs and other sharp projections which could damage the Gruvlok gasket; grooving is not required.
Gruvlok roll grooving machines produce a groove to proper dimensional tolerances, concentric with the pipe O. Pipe and Gruvlok hole cutting tools properly center holes for correct assembly of Gruvlok branch outlet components. Weld Fitting and Cut-Grooving: Cut grooving is intended for use with standard and heavier wall pipe. Cut grooving produces a groove in the pipe wall by removing metal from the pipe O. The groove removes less Cut Grooving than one half of the pipe wall and does not cut as deeply into the pipe wall as do standard pipe Bolt threads.
Thread Cut Groove vs. Information Roll-Grooving: Roll grooving does not remove metal. Instead, metal is displaced while a groove is formed into the outer surface of the pipe wall. Roll grooving is commonly used on a wide range of pipe thicknesses up Standards Tee-Let Installation to 0. Available Movement Roll Groove vs. The outside pipe 15, 20, 25 Any scale, projections or 32, 40 The nominal Roughneck Couplings must be free of any outside diameter of pipe should not vary notches, bumps, weld bead, score marks, etc.
XL Min. Any sharp edges, burrs, Size Nom O. No additional cleaning is required. Beveled pipe. The sharp O. If this sharp edge is not removed, it may damage the gasket as the pipe is inserted into the Sock-It Fitting. Nominal ISO Pipe size. ISO outside diameter. COLUMN 3 - Gasket seat must be free from scores, seams, chips, rust or scale which may interfere with proper sealing of the gasket.
See column 6. Measured at the most extreme pipe end diameter of the gasket seat area. Out of roundness: Difference between maximum O. For IPS pipe, the maximum allowable tolerance from square cut ends is 0. For ISO size pipe, the maximum allowable tolerance from square cut ends is 0.
Failure to do so may result in damage to the roll groov- ing machine and unacceptable roll grooves may be produced. Failure to do so may result in damage to the roll grooving machine and unac- ceptable roll grooves may be produced.
Flare Ref. Not to be used with End Guard gaskets. Only Thick. Only Tol. Size Actual Tolerance Actual Tol. COLUMN 4 - Gasket seat and groove must be free from scores, seams, chips, rust or scale which may interfere with proper coupling assembly. See column 7. Measured at the most extreme tubing end diameter of the gasket seat area.
Connection Dia. Only Dia. Information The maximum allowable tolerance from square cut ends is 0. Allowable tolerance from square cut ends is 0.
Movement is possible in the Gruvlok coupling due to two factors: 1 designed-in clearance between the key of the coupling and the groove diameter and groove width, and 2 the gap between pipe ends joined by the coupling. The values account for pipe, groove, and coupling tolerances.
Maximum Oper. Thus, the number of couplings is determined as follows: No. The Gruvlok coupling will not allow for both maximum linear and maximum angular movement simultaneously.
In systems where both are expected, additional joints may be required. Gruvlok For Expansion In the example above, two couplings were added to account for thermal expansion and the other couplings accommodate only the misalignment. The additional stress from the combined movement is therefore relieved. However, Gruvlok Couplings should never be used as a continuous swivel joint. For pipe rotation, the system must be shut down and internal pressure relieved.
The pipe may then be rotated one-quarter turn, the couplings retightened, and service resumed. If performed on a regular basis, pipe rotation will evenly distribute wear over the entire inner surface of the pipe.
Buried Pipe Systems Pitched drainage systems, buried pipe systems where pipe laying conditions are subject to settlement, and exposed pipe systems laid on rough ground are but a few of the many types of pipe installations that present conditions where the functional capability of the Gruvlok coupling are useful.
Standard Coupling , , , For example: for 6" x 6" x 3" tee, the branch value of 3" is Pipe and Size FIG. Center to end dimensions may differ from those shown in chart, contact an Anvil Rep.
The formula predicts bursting pressures that have been found to be safely within the actual test bursting pressures. X XX Dia. Schedule No. Tubing O. A max max 12 trans. Resistance welded steel pipe for liquid,. Heat treatment A I 60, 30, 25 — —. As above. Pipe Size H Nom. All dimensions shown are in inches. Bolt Circle No. Flange Nom. Pipe Bolt No. Bolt No. Flange LB. Bolt Dia. Bolts Dia. Bolt I.
Bolt holes straddle the center line. Length I. Thickness Face Dia. Bolts Holes O. Data Installation Contents A.
All purpose. Good penetration. This is the electrode used for most carbon steel pipe welding. E Alternating Current, All Positions. High bead. Flat bead. Deep penetration. Can be used with A. In plan or elevation, near, far, and both sides, locations refer to nearest member parallel to plane of drawing and not to others farther behind. In section or end views only, when weld is not drawn, the side to which arrow points is considered near side. Welds on both sides are of same size unless otherwise shown.
Gruvlok 4. Symbols govern to break in continuity of structure or to extent of hatching or dimension lines. Pipe and 6. All welds are continuous and of user's standard propertions and all except V-grooved and bevel-grooved welds are closed unless otherwise shown. When welds are drawn in section or end views, obvious information is not given by symbol.
Weld Fitting and 8. In joints in which one member only is to be grooved, arrows point to that member. Size, weld symbol, length of weld and spacing must read in that order from left to right Pipe Thread Drop Nipple and Conversions General Welding along the reference line.
Neither orientation of reference line nor location of the arrow alter this rule. The perpendicular leg of , , , weld symbols must be at left. Arrow and other side welds are of the same size unless otherwise shown.
WORK 33, Btu per hr. B Before starting the job of making sprinklers into steel threads of the MIN. C The use of an anaerobic pipe thread MIN. The same procedure would apply if a leak has been detected.
If within tolerance, reapply the anaerobic pipe sealant and make-on to the required length. Allow twenty-four hours for setting. Damage to the Adjustable Drop Nipple or Sprinkler may result. It is recommended that the system pressure be relieved when adjusting, however it is not necessary to drain the system. Adjustable Drop Nipples described herein must be installed and maintained in compliance with this document as well as the applicable standards of the National Fire Protection Association in addition to the standards for any other authorities having jurisdiction.
Petroleum based lubricants are incompatible with EPDM and will impair serviceability of the unit. Thread Make-up and Installation A For use in systems installed in accordance with all applicable standards or codes. Compare number of threads counted to the number of required fully developed threads as shown in the thread chart located on the back of this sheet.
If thread count is correct, proceed with installation Step C , if thread count does not match, check nipple or sprinkler for proper thread gage measurement and discard if not to ANSI B1. D If either of the above fails to allow the sprinkler or nipple to make-up to a minimum of full threads, do not over tighten.
One advantage of cutting the hole after welding is that the pipe is left intact during welding thereby reducing shrinkage and possible distortion. If holes are cut prior to welding, as some codes require, then the following hole sizes are recommended. Every effort must be made to avoid welding too hot or overheating both the pipe and the Tee-Let.
Excessive heat may cause the wrench tight threads those in the bottom of the Tee-Let near the weld zone to distort while also causing the branch pipe to bend. It should be noted that Merit Tee-Lets have been subjected to exhaustive testing and evaluation, and only negligibly distort when subjected to excessive heat. The threads, on the other hand, may not return to their gauged form after cooling if excessive heat causes them to expand. Co2 - Deeper penetration, faster welding, low cost.
Merit assumes no liability for any consequential damages resulting from the improper use of its Tee-Let Welding Outlet Fittings, nor for any recommendations made with respect to installation procedures. Data Installation Contents Gruvlok Table of 1 Inspect both male and female components prior to assembly. Alternately, an anaerobic sealant may be utilized. Best application is achieved with a brush stiff enough to force sealant down to the root of the threads.
Standard 5-B for Line Pipe Threads. Reprinted by permission from Catalog No. Size Pipe O. Width of Flange per Ft. Width Section per Ft.
Span Ft 7 7 7 9 10 11 12 13 14 16 17 19 22 23 25 27 28 30 32 33 Water Service Max. Span Ft 5 5 6 7 8 8 9 10 11 12 Water Service Max. The following factors should be considered when designing hangers and supports for a grooved-end pipe system. Size Range Between Supports In. The possibility of temperature overrides beyond regular working temperatures and cost may either make either of the alternatives more desirable. CT Fig. CTR Fig. Welding rings may be employed to assure proper alignment as well as the correct welding gap.
Pipe-to-Pipe 1. Level one length of pipe using spirit level. Bring lengths together leaving only small welding gap. Place spirit level over both pipes as shown and maneuver unpositioned length until both are level. Tack weld top and bottom. Repeat procedure. Level pipe using spirit level.
Tack weld in place. Place spirit level on face of elbow and maneuver elbow until level. Tee-to-Pipe 1. Place tee to pipe leaving small welding gap. Place spirit level on face of tee and maneuver tee until level.
Fitting Data 2. Check sides in same way. Heat bottom of notch with torch. Place elbow in jig and saw half thru sides of channel iron as shown. Repeat this step with several elbows so jig may be used for different operations. A used hack saw blade placed in notch as shown will provide proper welding gap. Drill Dia.
A substance composed of two or more metals or a metal and a compound. A softening treatment consisting of heating carbon or alloy steel or cast iron to an appropriate temperature, holding the temperature for a proper period of time and slowly cooling to ambient temperature.
Another term for a concentric reducer. Bar Plug Iron plugs in the 4" thru 8" size that have slotted rather than square heads. Black Pipe Blind Flange Any part of the piping system other than a main, riser or stack. Bubble Tight The condition of a valve seat that prohibits the leakage of visible bubbles when closed.
Bull Head Tee The outlet of the tee is larger than the run. Butt Nipple A nipple with NPT threads and a shorter overall length than a close nipple used when there is a space consideration. A special order item.
Butt Weld A circumferential weld in pipe fusing the abutting pipe walls completely from inside wall to outside wall. Cast Iron Carbon Steel Pipe Steel pipe that owes its properties mostly to the carbon it contains. Shaikh Mohammed Nazim. Abo Hasan Abade. Mohammed Kassab.
Mariness Delgado. Ravindra S. Piping Coordination Systems - Mechanical symbols for Isometric drawings -. Ivan Roco. Atif Husayn. Popular in Book. Hyungsouk Kang. John Strickler. Omar Ammar. University of Washington Press. Bintang Asmara. Moises Saavedra. Andrei Cornea. Luz Estella Nuno. Lea Delatorre. Allan Abad. Stephen Jun. Harry Cordero Castillo. Bianca Viorela. James Felix Bien. Joaquin Hernandez.